Saturday, July 18, 2009

Final details

This week has been completing everything needed for occupancy inspections. All items have to be in and functional, especially lighting, outlets, HVAC, and hot & cold water. We passed the building inspection, and now have to wait 1 week for the local township occupancy inspection; then on to closing. The final detail of the dining room is crown molding around the ceiling.

The main stairway and railings have been completed, as well as the one into the basement. Here you see the open stairway railings and posts up to the second floor, and the railings along the front of the loft. All of these are stained oak.

The screened porch final got its screens, stairs and railings, as well as a railing along the top of the exterior basement stairway. Porch lighting, both in and out, is also in and working.