Wednesday, March 11, 2009

Ready for the Foundation


We began by defining the driveway, and then quickly went to work on the bottom of the foundation hole to reach its proper depth and clean out the corners.

Then laying drain pipe around the outer edge to connect up with the sump pump located at the back left. Then 3 loads of gravel to define the floor base.

And a foundation is prepared for the garage as well. A fourth load of gravel is needed for this.

Now we are ready for the Superior Walls to be delivered Thursday and set in by crane, sealed together, and then ready for Friday’s foundation floor pour.