The sun was out all day, but now at 7 PM it’s pouring. However, the concrete team was out and poured the garage floor, the garage side-door slab, and the exterior basement stairs

The builder’s (jack-of-all-trades) framing team prepared the sidewalk framing to allow the concrete team to pour 3 portions of the sidewalk. The connecting portions will be done in the next week when we are all waiting for the plaster to dry on all the drywall, which starts tomorrow.

The dirt around the yard was mostly thick mud, but a great effort was made to grade it out with the wettest sections moved to several common piles to dry out. We got the go-ahead from the gas company to fill in the trench holding the yellow gas line to the house. And, no it is not connected to the port-a-potty.