Tuesday, June 22, 2010
Late spring at the Lunger's
Sunday, August 30, 2009
Finally moved in.
Here’s our living room looking down from the
Our dining room is very much the same with our favorite Scandinavian dining room set. The French doors take you onto our screened porch.
Our kitchen reflects the way we want to eat and prepare foods. T
We also have a wonderful view from our porch into our dining room and beyond into t
So come on down to visit with us, anytime. We’d love to have you over.
Monday, August 3, 2009
Finishing touches
We have occupancy and are moving in tomorrow; w
Here are some finishing touches on the house that is now completely done.
The front door is complete with stain and polyurethane. Inside we have the living
There is also the completed staircase to the loft and 2 second floor bedrooms and bath.
We are particularly pleased with our lighting choices including kitchen and hall pendants, as well as numerous recessed lights.
Saturday, July 18, 2009
Final details
This week has been completing everything needed for occupancy inspections. A
ll items have to be in and functional, especially lighting, outlets, HVAC, and hot & cold water. We passed the building inspection, and now have to wait 1 week for the local township occupancy inspection; then on to closing. The final detail of the dining room is crown molding around the ceiling.

The main stairway and railings have been completed, as well as the one into the basement. Here you see the open stairway railings and posts up to the second floor, and the railings along the front of the loft. All of
these are stained oak.
The screened porch final got its screens, stairs and railings, as well as a railing along the top of the exterior basement stairway. Porch lighting, both in and out, is also in and working.
The main stairway and railings have been completed, as well as the one into the basement. Here you see the open stairway railings and posts up to the second floor, and the railings along the front of the loft. All of
The screened porch final got its screens, stairs and railings, as well as a railing along the top of the exterior basement stairway. Porch lighting, both in and out, is also in and working.
Saturday, July 11, 2009
Landscape views
Here’s a view from the east with its bed of plantings. This will offer a great
The south view shows today’s seeding. The grass area along the bottom of this shot is part of the required right-of-way that goes out to the road.
Friday, July 10, 2009
Grass seeding
We used the hydroseeding approach. A huge tank mixes together grass seeds, fertilizer, tackifier, mulch, and water. The mix is sprayed on the areas to be seeded. The tackifer is glue-like and helps the mix stick together and to the ground.
The final result is a greenish surface that almost looks like grass. Grass should start showing in 5 days. Lots of watering to do, and the need for a riding mower within the next month.
Wednesday, July 8, 2009
Landscaping Day 3 and Driveway
Here’s a view along the south end of the property. In the center is a bed with 5 green giant arborvitae, dwarf forsythia and “tea” viburnums. The bed on the right corner is matched by the one on the left rear corner, and includes burning bush and “sparkleberry” holly. The bed in the
The driveway crew arrived this afternoon and laid the driveway. Now complete, you see it and the beds along the front and side of the house. The beds include hostas, hydrangea, boxwoods, holly, cypress, and several grasses.
Subscribe to:
Posts (Atom)