The gutter team was on site as well and set to work making each gutter to length and attaching to the house. When that was done, they prepared all the downspouts and installed them.
The framing guys were also back to ready the garage floor for poured concrete tomorrow. They added enough stone to bring it up to the right level, and then laid rebar to provide a strong floor. They also prepared the framing for the basement stairs and garage door slab to be poured as well.