Wednesday, April 22, 2009

Stairs and Siding

We have still been impacted by rainy days that have made for slight delays. However, the main stairway was delivered and by day’s end the entire framing team was available to raise them to the second floor.

The electrical work also began by laying out the locations of the wall outlets and switch boxes, and now that we can actually be in the space, we went around and nudged them slightly to better fit our needs. (no pix)

The siding team began and the detail needed to frame the windows and prepare for each piece of siding was more than imagined. The rear is attacked first and halfway done by late afternoon when the rains and thunder came back dramatically.